EASTON PRIMARY SCHOOL
The client, a tier one mechanical and electrical contractor, was required to reduce carbon dioxide emissions by 20% through the installation of a solar PV system. As part of Bristol City Council’s sustainability requirement, we also installed a public display in the reception to educate the staff, pupils and visitors.
We designed the system with ‘all-black’ monocrystalline LG panels to ensure minimal visual impact.